叠合梁斜拉桥施工工序繁多,最终的成桥状态与施工过程密切相关。以一大跨度叠合梁斜拉桥为对象,采用空间有限元软件建立精细化力学模型,对比分析了混凝土桥面板湿接缝不滞后、滞后1次及滞后2次这3种施工工序对桥梁结构在施工过程及成桥的受力影响。结果表明,滞后1次及滞后2次的工序下桥面板几乎不出现拉应力,而随着桥面板滞后次数的增加,钢主梁的压应力显著增大,选择桥面板滞后1次的施工工序,结构在施工过程中及成桥运营阶段的受力最佳,同时工期也较短。