Jiang, Yue (Jiang, Yue.) | Li, Yanlin (Li, Yanlin.) | Yao, Aijun (Yao, Aijun.) (Scholars:姚爱军) | Gao, Xiangzhi (Gao, Xiangzhi.) | Li, Hui (Li, Hui.)

Indexed by:

Scopus SCIE

Abstract:

In recent years, there has been a rise in the construction of expansive underground structures and shield tunnels with exceptionally large diameters. These projects introduce unique challenges regarding their impact on the surrounding soil and structures, which differ from those typically encountered in conventional shield tunnels. However, the existing body of research in this specific domain remains insufficient. When such tunnels intersect deep foundation pits supported by piled-raft foundations, the discrepancies in soil deformation can become even more pronounced. At present, there is a dearth of research on the underlying principles governing these differences, and theoretical investigations have not kept pace with practical engineering applications. Consequently, the existing settlement prediction methods employed for diverse projects need to be reevaluated and adjusted to accommodate the distinctive characteristics of each individual project. Regarding the engineering focus of this paper, it is crucial to recognize that soil subsidence in the pit bottom has a significant influence on the mechanical response of the piles. Consequently, the implementation of targeted correction measures remains consistently important. Based on this concept, this paper focuses on a super-large diameter shield tunnel project that under-crossed a deep foundation pit with a piled-raft foundation. The influence of different construction methods on the settlement law of the soil at the bottom of the deep foundation pit is discussed after verification of the accuracy of the model through numerical simulation and field monitoring data. Additionally, two correction coefficients that consider the project's load characteristics are proposed in this research. These coefficients were used to correct the surface settlement curve. The corrected soil settlement curve at the pit's bottom can successfully reflect the numerical simulation results, which in turn can reflect the mechanical response of the pile under the influence of tunnel excavation.

Keyword:

piled-raft foundation engineering geology deep foundation pit ground subsidence prediction super-large diameter shield tunnel

Author Community:

  • [ 1 ] [Jiang, Yue]Beijing City Sub Ctr Stn Integrated Hub Constructi, Beijing 101100, Peoples R China
  • [ 2 ] [Li, Yanlin]Beijing Univ Technol, Key Lab Urban Secur & Disaster Engn, Minist Educ, Beijing 100124, Peoples R China
  • [ 3 ] [Yao, Aijun]Beijing Univ Technol, Key Lab Urban Secur & Disaster Engn, Minist Educ, Beijing 100124, Peoples R China
  • [ 4 ] [Gao, Xiangzhi]Beijing Univ Technol, Key Lab Urban Secur & Disaster Engn, Minist Educ, Beijing 100124, Peoples R China
  • [ 5 ] [Li, Hui]Beijing Univ Technol, Key Lab Urban Secur & Disaster Engn, Minist Educ, Beijing 100124, Peoples R China

Reprint Author's Address:

Show more details

Related Keywords:

Source :

APPLIED SCIENCES-BASEL

Year: 2023

Issue: 9

Volume: 13

2 . 7 0 0

JCR@2022

ESI Discipline: ENGINEERING;

ESI HC Threshold:19

Cited Count:

WoS CC Cited Count: 1

SCOPUS Cited Count: 2

ESI Highly Cited Papers on the List: 0 Unfold All

WanFang Cited Count:

Chinese Cited Count:

30 Days PV: 1

Affiliated Colleges:

Online/Total:705/10708678
Address:BJUT Library(100 Pingleyuan,Chaoyang District,Beijing 100124, China Post Code:100124) Contact Us:010-67392185
Copyright:BJUT Library Technical Support:Beijing Aegean Software Co., Ltd.