Indexed by:
Abstract:
The surrounding environment and the site of the construction of the South Square Transportation Hub Center of Changchun Railway Station are complex, the excavation area is large, the shape is irregular, and the form of foundation pit is complex. In order to better verify the applicability of the cut-top down method to the project compared with the cut-cover method, and its advantages in environmental protection and deformation control, now it is constructed under the same control condition using the cut-cover method and the cut-cover method. Through FLAC3D simulation of the construction process under the two-work methods, the deformation of the surface around the foundation pit and the deformation of the structure itself are explored separately, and a more advantageous method is compared and analyzed. Analysis results show that in the two aspects of surrounding environmental protection and underground structure deformation control, the original project adopts the cover and cut-top down method is better than that of the cut-cover method. © 2020, Editorial Office of Journal of Liaoning Technical University. All right reserved.
Keyword:
Reprint Author's Address:
Email:
Source :
Journal of Liaoning Technical University (Natural Science Edition)
ISSN: 1008-0562
Year: 2020
Issue: 2
Volume: 39
Page: 136-144
Cited Count:
WoS CC Cited Count: 0
SCOPUS Cited Count:
ESI Highly Cited Papers on the List: 0 Unfold All
WanFang Cited Count:
Chinese Cited Count:
30 Days PV: 4
Affiliated Colleges: