Guo, F. (Guo, F..) | Kong, H. (Kong, H..) | Sun, K. (Sun, K..) | Tao, L. (Tao, L..) | Zhang, Y. (Zhang, Y..) | Meng, Y. (Meng, Y..)

Indexed by:

Scopus

Abstract:

To promote China′s Carbon Peaking and Neutralization Policy, provide data support for energy conservation and emission reduction of metro projects, and address the complex and cumbersome problem of greenhouse gas quantification process in the construction stage of metro deep foundation pit engineering, a modular calculation method for carbon emissions in the construction stage of metro foundation pit engineering is established based on the whole life cycle theory. Due to the fact that the metro foundation pits are temporary, the carbon emission calculation process is divided into three stages: Upstream material production, foundation pit site construction, and material transportation. Furthermore, the greenhouse gas emissions during construction process of the 02B foundation pit and the pit in pit of the Beijing City Sub-Central station comprehensive transportation hub project are calculated and analyzed. The results show that: (1) The CO2 emitted during the construction stage of 02B foundation pit and the pit in pit reached 20 498.50 t and 32 422.50 t, respectively. (2) The carbon emission in the construction stage of the metro deep foundation pit project is related to the construction method and support strength of the metro deep foundation pit. © 2022, Editorial Office of Tunnel Construction. All rights reserved.

Keyword:

Railway engineering Foundation pit engineering Full life cycle Carbon emissions

Author Community:

  • [ 1 ] [Guo F.]Beijing Municipal Construction Co., Ltd, Beijing, 100020, China
  • [ 2 ] [Kong H.]Beijing Municipal Construction Co., Ltd, Beijing, 100020, China
  • [ 3 ] [Sun K.]Civil and Transportation Engineering, Beijing University of Technology, Beijing, 100124, China
  • [ 4 ] [Tao L.]Civil and Transportation Engineering, Beijing University of Technology, Beijing, 100124, China
  • [ 5 ] [Zhang Y.]Civil and Transportation Engineering, Beijing University of Technology, Beijing, 100124, China
  • [ 6 ] [Zhang Y.]Civil and Transportation Engineering, Beijing University of Civil Engineering and Architecture, Beijing, 102627, China
  • [ 7 ] [Meng Y.]Civil and Transportation Engineering, Beijing University of Technology, Beijing, 100124, China

Reprint Author's Address:

Email:

Show more details

Related Keywords:

Source :

Tunnel Construction

ISSN: 2096-4498

Year: 2022

Issue: S2

Volume: 42

Page: 197-206

Cited Count:

WoS CC Cited Count: 0

SCOPUS Cited Count: 5

ESI Highly Cited Papers on the List: 0 Unfold All

WanFang Cited Count:

Chinese Cited Count:

30 Days PV: 5

Affiliated Colleges:

Online/Total:501/10608377
Address:BJUT Library(100 Pingleyuan,Chaoyang District,Beijing 100124, China Post Code:100124) Contact Us:010-67392185
Copyright:BJUT Library Technical Support:Beijing Aegean Software Co., Ltd.