Indexed by:
Abstract:
Based on the geological conditions of Shenzhen region, the experience of traditional single mode shield tunneling was summarized. Studied the adaptability and technical characteristics of shield tunneling, proposed the concept of EPB-TBM dual mode shield tunneling machine, and fully applied it to the fourth phase of Shenzhen Metro project. This paper analyzes and studies the practical applications of multiple engineering projects, summarizes and analyzes the efficiency, consumption of cutter tool, mode switching, economy, and existing problems of dual mode shield tunneling, and puts forward relevant suggestions to provide reference for similar projects in the future. © 2024 The Author(s).
Keyword:
Reprint Author's Address:
Email:
Source :
Year: 2024
Page: 2148-2156
Language: English
Cited Count:
SCOPUS Cited Count:
ESI Highly Cited Papers on the List: 0 Unfold All
WanFang Cited Count:
Chinese Cited Count:
30 Days PV: 6
Affiliated Colleges: