Indexed by:
Abstract:
The monitoring and theoretical studies for deep excavation are lack in Beijing. The monitoring results of deep excavation of China World Trade Center Tower phase 3 in Beijing during excavation process are analyzed. The study results show that:(1) Under normal circumstances, the displacement of pile-anchor bracing system is generally not more than 0.1%H, where H is the depth of foundation pit. (2) The stress of reinforcement in pile is usually only 1/10-1/8 of design strength. (3) The actual tension of anchor is smaller than the design value, which shows that the adopted earth pressure in the design of support system is larger than the actual earth pressure. (4) The tensions of each row soil nailings are all less than 38 kN, which is far less than the design value calculated by current regulations. It is found that the actual steel stress, anchor tension and soil-nailling tension are all less than the current theoretical values. The monitoring results can provide a reference to the similar projects and the basis for amendments to the subsequent procedures.
Keyword:
Reprint Author's Address:
Email:
Source :
Chinese Journal of Rock Mechanics and Engineering
ISSN: 1000-6915
Year: 2012
Issue: 11
Volume: 31
Page: 2319-2326
Cited Count:
WoS CC Cited Count: 0
SCOPUS Cited Count:
ESI Highly Cited Papers on the List: 0 Unfold All
WanFang Cited Count:
Chinese Cited Count:
30 Days PV: 15
Affiliated Colleges: