In allusion to the cable tension controlling problem in the parallel strand stayed-cable construction, on the basis of construction techniques of applying tension loads one by one, the mechanical model of the cable-girder-tower in the process of construction was established. With the equal cable tension as a goal, the formula was deduced with the method of forward-analysis, which could be used to calculate the initial tension of each strand in construction. The effect of temperature variations on the initial tension could be eliminated by using the formula with the method of equivalent tension. Moreover, a method was proposed to measure the cable tension in the processes of construction and performing the function. Finally, the practice in one cable-stayed bridge in the north indicated that 1) the uniform cable tension could be obtained by the proposed method; 2) the tension error range of whether a single strand or the whole stayed-cable was within 5%, and the result could meet the needs in construction control; 3) the method could provide reference for the similar stayed-cable construction.
Keyword:
Reprint Author's Address:
Email:
Source :
Journal of Civil, Architectural and Environmental Engineering
ISSN: 1674-4764
Year: 2010
Issue: 5
Volume: 32
Page: 130-134
Cited Count:
SCOPUS Cited Count:
ESI Highly Cited Papers on the List: 0 Unfold All
WanFang Cited Count:
Chinese Cited Count:
30 Days PV: 9
Affiliated Colleges: