Indexed by:
Abstract:
According to the state of aseismatic structure, by introduction of finite period Markov decision theory, the problem of maintenance strategy optimization of aseismatic structure during design reference is discussed in detail. A mathematical model of stochastic dynamical programming with maximum expected reward during the design reference period is presented. By solution of Markov decision inverted sequence, the optimum maintenance strategy of each stage and total maximum expected reward can be obtained during the design reference period. An optimization maintenance strategy of expected reward maximization is given during the design reference period. All of these provide a scientific method for maintenance decision-making. Iterative computation of this stochastic dynamic method can be programmed, greatly decreasing the amount of work.
Keyword:
Reprint Author's Address:
Email:
Source :
Journal of Harbin Institute of Technology
ISSN: 0367-6234
Year: 2006
Issue: 2
Volume: 38
Page: 250-252,320
Cited Count:
WoS CC Cited Count: 0
SCOPUS Cited Count:
ESI Highly Cited Papers on the List: 0 Unfold All
WanFang Cited Count:
Chinese Cited Count:
30 Days PV: 8
Affiliated Colleges: