• Complex
  • Title
  • Keyword
  • Abstract
  • Scholars
  • Journal
  • ISSN
  • Conference
搜索

Author:

Li, Ji Dong (Li, Ji Dong.) | Tao, Lian Jin (Tao, Lian Jin.) (Scholars:陶连金) | An, Jun Hai (An, Jun Hai.) | Wu, Bingl Lin (Wu, Bingl Lin.)

Indexed by:

EI Scopus

Abstract:

In this paper, the Beijing 10-line New Gongzhufen station close-attached undercrossing the existing Subway Line 1 Station is taken as engineering background, and studying on the application of the flat-top straight wall Cross Diaphragm(CRD)+ multiple pre-top bracing concealed excavation construction method in the large cross-section metro station closely-attached undercrossing the existing station. The result shows that the construction method can effectively control settlement of the existing station and satisfy the 3mm settlement control indicators of the bottom of the existing station. So the construction method is an applicable value in the construction of the strictly close-attached passing through the existing buildings. © (2014) Trans Tech Publications, Switzerland.

Keyword:

Applications Diaphragms Excavation Subway stations

Author Community:

  • [ 1 ] [Li, Ji Dong]Beijing University of Technology, Beijing, 100124, China
  • [ 2 ] [Tao, Lian Jin]Beijing University of Technology, Beijing, 100124, China
  • [ 3 ] [An, Jun Hai]Beijing University of Technology, Beijing, 100124, China
  • [ 4 ] [Wu, Bingl Lin]Beijing University of Technology, Beijing, 100124, China

Reprint Author's Address:

Email:

Show more details

Related Keywords:

Source :

ISSN: 1022-6680

Year: 2014

Volume: 926-930

Page: 640-644

Language: English

Cited Count:

WoS CC Cited Count:

SCOPUS Cited Count: 2

ESI Highly Cited Papers on the List: 0 Unfold All

WanFang Cited Count:

Chinese Cited Count:

30 Days PV: 8

Online/Total:1138/10577155
Address:BJUT Library(100 Pingleyuan,Chaoyang District,Beijing 100124, China Post Code:100124) Contact Us:010-67392185
Copyright:BJUT Library Technical Support:Beijing Aegean Software Co., Ltd.