• Complex
  • Title
  • Keyword
  • Abstract
  • Scholars
  • Journal
  • ISSN
  • Conference
搜索

Author:

Zhang-Huirong (Zhang-Huirong.) | Feng, Xiaochen (Feng, Xiaochen.)

Indexed by:

EI Scopus

Abstract:

This paper put forward a bidding-decision frame system which was based on risk analysis, and gave a case study of its application. The conclusions are as follows: (1) Research on risk management and bidding decisions has important values in mitigating the losses once risk happen. (2) The research should be dynamic, because the risks in the construction are dynamic. (3) The analysis should be both quantified and qualified. © 2011 IEEE.

Keyword:

Risk analysis Decision making Risk assessment Risk management

Author Community:

  • [ 1 ] [Zhang-Huirong]Dept. of Civil Engineering, Beijing University of Technology, Beijing, China
  • [ 2 ] [Feng, Xiaochen]Dept. of Civil Engineering, Beijing University of Technology, Beijing, China

Reprint Author's Address:

  • [zhang-huirong]dept. of civil engineering, beijing university of technology, beijing, china

Show more details

Related Keywords:

Source :

Year: 2011

Volume: 2

Page: 131-133

Language: English

Cited Count:

WoS CC Cited Count:

SCOPUS Cited Count:

ESI Highly Cited Papers on the List: 0 Unfold All

WanFang Cited Count:

Chinese Cited Count:

30 Days PV: 6

Online/Total:714/10569374
Address:BJUT Library(100 Pingleyuan,Chaoyang District,Beijing 100124, China Post Code:100124) Contact Us:010-67392185
Copyright:BJUT Library Technical Support:Beijing Aegean Software Co., Ltd.