Indexed by:
Abstract:
At present, long span cable-stayed bridge seismic performance study only takes its main bridge as an analysis object. There are few reports about earthquake impact between a cable-stayed bridge and its approach-bridge. Taking a Jiu-Jiang big bridge as an example, the impact analysis model between a cable-bridge and its approach-bridge was built. The impact influence factors between them were systematically studied. The influence factors included site-type, height of gravity center, approach-bridge structure form. Some significant conclusions were obtained. They provided a reference for similar project a seismic designing.
Keyword:
Reprint Author's Address:
Email:
Source :
Journal of Vibration and Shock
ISSN: 1000-3835
Year: 2012
Issue: 23
Volume: 31
Page: 115-117,127
Cited Count:
WoS CC Cited Count: 0
SCOPUS Cited Count:
ESI Highly Cited Papers on the List: 0 Unfold All
WanFang Cited Count:
Chinese Cited Count:
30 Days PV: 5
Affiliated Colleges: