• Complex
  • Title
  • Keyword
  • Abstract
  • Scholars
  • Journal
  • ISSN
  • Conference
搜索

Author:

Tao Lianjin (Tao Lianjin.) (Scholars:陶连金) | An Junhai (An Junhai.) | Li Jidong (Li Jidong.) | Cai Dongming (Cai Dongming.)

Indexed by:

CPCI-S Scopus

Abstract:

Due to the special landform and physiognomy in the mountain highway construction, it's often necessary to excavate of road cutting in a complex geological environment, including high and steep slope. And the security of cut slope in construction has a deep influence on the normal development of the whole project. Whether the construction of high slope engineering is safe or not depends on many uncertainty factors. Generally, the sole safety factor can't deal with these uncertainties. Therefore, in the course of construction operation, analyzing and assessing the risk of slope engineering to avoiding and reducing risk is substantial. According to the characteristics of the slope engineering projects, considering to the experience of this kind of project management, the engineering geological conditions, site conditions, the height of slope and climate conditions were chosen as the overall risk assessment indicators of high slope engineering in the construction safety, and demonstrate the rationality of selecting the indicators in detail. Afterwards, based on the knowledge of probability theory and mathematical statistics, the scores of overall safety risk of construction can be divided into four levels, then evaluate the criticality of slope construction quantitatively and thereby provide scientific decision-making basis for different risk rank of slope engineering to take corresponding risk control measures. Furthermore, the special risk assessment of construction safety is suggested to the high slope engineering whose overall risk rank is level III and over. At last, based on Hubei Yunshi highway which is being constructed, the overall risk assessment on the construction of cut slope engineering was made and suitable evaluation result was obtained. Then compared with the actual construction situation, found evaluation results and actual situation are keep in coincide. So the effectiveness of the risk assessment system is verified.

Keyword:

Overall risk assessment Evaluation index system Risk rank Cut slope

Author Community:

  • [ 1 ] [Tao Lianjin]Beijing Univ Technol, Coll Architecture & Civil Engn, Beijing 100124, Peoples R China
  • [ 2 ] [An Junhai]Beijing Univ Technol, Coll Architecture & Civil Engn, Beijing 100124, Peoples R China
  • [ 3 ] [Li Jidong]Beijing Univ Technol, Coll Architecture & Civil Engn, Beijing 100124, Peoples R China
  • [ 4 ] [Cai Dongming]Beijing Univ Technol, Coll Architecture & Civil Engn, Beijing 100124, Peoples R China

Reprint Author's Address:

  • [An Junhai]Beijing Univ Technol, Coll Architecture & Civil Engn, Beijing 100124, Peoples R China

Show more details

Related Keywords:

Related Article:

Source :

ENGINEERING GEOLOGY FOR SOCIETY AND TERRITORY, VOL 6: APPLIED GEOLOGY FOR MAJOR ENGINEERING PROJECTS

Year: 2015

Page: 995-999

Language: English

Cited Count:

WoS CC Cited Count: 1

SCOPUS Cited Count: 1

ESI Highly Cited Papers on the List: 0 Unfold All

WanFang Cited Count:

Chinese Cited Count:

30 Days PV: 10

Online/Total:558/10591530
Address:BJUT Library(100 Pingleyuan,Chaoyang District,Beijing 100124, China Post Code:100124) Contact Us:010-67392185
Copyright:BJUT Library Technical Support:Beijing Aegean Software Co., Ltd.