Indexed by:
Abstract:
Based on the twin shield tunnel traversing beneath the subgrade of the high-speed railway, the numerical model of FLAC3D was established in the light of the soft clay conditions in Tianjing. Considering the factors of the CFG composite foundation, train load, backfill grouting, grouting pressure, Soil compartment of the working face pressure, staggering distance, underground water, all the process of the shield tunnel traversing the subgrade was simulated, and the lateral settlement of the top of the subgrade was analyzed. The study shows that the maximum value of the settlement on the top of the subgrade equals to 6.88 mm, and the maximum settlement grade is 0.29‰. Settlement trough with unimodal shape was comparatively flat, and the settlement induced by the construction of the former tunnel isgreater than the later one.
Keyword:
Reprint Author's Address:
Email:
Source :
Journal of Beijing University of Technology
ISSN: 0254-0037
Year: 2010
Issue: 12
Volume: 36
Page: 1618-1623
Cited Count:
WoS CC Cited Count: 0
SCOPUS Cited Count:
ESI Highly Cited Papers on the List: 0 Unfold All
WanFang Cited Count:
Chinese Cited Count:
30 Days PV: 16
Affiliated Colleges: