Indexed by:
Abstract:
The case study presented is based on a new shield tunnel approaching, which is close to an existing subway tunnel in Beijing. With theoretical analysis, numerical modeling and the feedback of field monitoring, the influences on the existing shield tunnel in terms of longitudinal and transverse displacements, bending moment, and axial force brought by the newly parallel approaching one are investigated. And it reveals that there is the longitudinal effect on the existing tunnel when the extremely close shield moves forward, which is presented as the phenomenon of 'early stress arrival and deformation lagging'. The study results verify that the effectiveness of the cross steel support is remarkable and especially the transverse steel support makes a great contribution to the improvement the existing tunnel stress state, which may provide informative experience for relevant cases.
Keyword:
Reprint Author's Address:
Email:
Source :
Chinese Journal of Rock Mechanics and Engineering
ISSN: 1000-6915
Year: 2009
Issue: 9
Volume: 28
Page: 1856-1862
Cited Count:
SCOPUS Cited Count:
ESI Highly Cited Papers on the List: 0 Unfold All
WanFang Cited Count:
Chinese Cited Count:
30 Days PV: 8
Affiliated Colleges: