• Complex
  • Title
  • Keyword
  • Abstract
  • Scholars
  • Journal
  • ISSN
  • Conference
搜索

Author:

Teng, Hai-Wen (Teng, Hai-Wen.) | Wang, Tao (Wang, Tao.) | Huo, Yu-Hui (Huo, Yu-Hui.) | Hao, Zhe (Hao, Zhe.)

Indexed by:

EI Scopus PKU CSCD

Abstract:

Ground settlement and tunnel stability problem caused by tunnel excavation are two key problems of subway tunnel construction. Based on the background of ShenYang subway No.1 Line, according to geological data, three dimension numerical model of tunnel excavation is established. To study soil settlement with excavation process more exactly, shotcrete and concrete liner are studied respectively. The relationship between soil settlement and excavation process by using different support thickness is established.

Keyword:

Convergence of numerical methods Subways Tunneling (excavation) Tunnels Numerical models

Author Community:

  • [ 1 ] [Teng, Hai-Wen]College of Architecture and Civil Engineering, Beijing University of Technology, Beijing 100124, China
  • [ 2 ] [Wang, Tao]College of Architecture and Civil Engineering, Beijing University of Technology, Beijing 100124, China
  • [ 3 ] [Huo, Yu-Hui]Asia Pacific Institute of Construction Science Information, Beijing 100044, China
  • [ 4 ] [Hao, Zhe]College of Architecture and Civil Engineering, Shenyang University, Shenyang 110044, China

Reprint Author's Address:

Email:

Show more details

Related Keywords:

Related Article:

Source :

Journal of Beijing University of Technology

ISSN: 0254-0037

Year: 2009

Issue: 8

Volume: 35

Page: 1074-1079

Cited Count:

WoS CC Cited Count: 0

SCOPUS Cited Count:

ESI Highly Cited Papers on the List: 0 Unfold All

WanFang Cited Count:

Chinese Cited Count:

30 Days PV: 5

Online/Total:507/10554636
Address:BJUT Library(100 Pingleyuan,Chaoyang District,Beijing 100124, China Post Code:100124) Contact Us:010-67392185
Copyright:BJUT Library Technical Support:Beijing Aegean Software Co., Ltd.