Indexed by:
Abstract:
The gymnasium of Northwestern University Chang an Campus is a new type of chord-supported space structure, which is a complex spatial prestressed structural system. The upper part of the roof structure is composed of a radial inverted triangular tube truss structure, the lower part is composed of circumferential cables and radial cables, and the upper structure and the lower structure arc connected by vertical struts. In this paper, finite clement software is used to simulate and analyze the construction process of the structure, and the stress and deformation of the structure in different construction stages arc studied. The structural stress and deformation caused by cable tension are analyzed, the influence of different unloading schemes on structural performance is studied, and a reasonable structural unloading scheme is proposed. The results show that the rotary cumulative slip construction scheme adopted for the structure installation is reasonable, the structural stress and deformation are small during the construction process. The overall stiffness of the structure increases with the construction process, and the stress is unevenly distributed. The simulation analysis of the construction process can provide guidance and early warning for the on-site installation of the structure, and provide technical reference for the construction of similar projects. © 2024 Science Press. All rights reserved.
Keyword:
Reprint Author's Address:
Email:
Source :
Journal of Xi'an University of Architecture and Technology
ISSN: 1006-7930
Year: 2024
Issue: 4
Volume: 56
Page: 578-585
Cited Count:
SCOPUS Cited Count:
ESI Highly Cited Papers on the List: 0 Unfold All
WanFang Cited Count:
Chinese Cited Count:
30 Days PV: 7
Affiliated Colleges: