Fang, Jianghua (Fang, Jianghua.) | Zhang, Zhihong (Zhang, Zhihong.) (Scholars:张志红) | Zhang, Jingyu (Zhang, Jingyu.)

Indexed by:

EI Scopus PKU CSCD

Abstract:

Freezing reinforcement and mining excavation were jointly conducted in recovering a collapsed tunnel in Shanghai metro No.4 line. According to the basic theory and engineering experience of artificial freezing, freezing system and parameters for the recovering collapsed tunnel were determined. Forced thawing was implemented sequentially for different sub-regions. Fill grouting between the structure and the frozen wall and thaw-settlement compensation grouting were used for control of strata thaw settlement.

Keyword:

Thawing Recovery Subways Concrete construction Freezing Mortar Grouting

Author Community:

  • [ 1 ] [Fang, Jianghua]Anhui University of Science and Technology, Huainan 232001, China
  • [ 2 ] [Zhang, Zhihong]Beijing University of Technology, Beijing 100124, China
  • [ 3 ] [Zhang, Jingyu]China Coal Special Constructional Engineering Company, Huaibei 235044, China

Reprint Author's Address:

Show more details

Related Keywords:

Related Article:

Source :

China Civil Engineering Journal

ISSN: 1000-131X

Year: 2009

Issue: 8

Volume: 42

Page: 124-128

Cited Count:

WoS CC Cited Count: 0

SCOPUS Cited Count:

ESI Highly Cited Papers on the List: 0 Unfold All

WanFang Cited Count:

Chinese Cited Count:

30 Days PV: 11

Online/Total:1205/10606662
Address:BJUT Library(100 Pingleyuan,Chaoyang District,Beijing 100124, China Post Code:100124) Contact Us:010-67392185
Copyright:BJUT Library Technical Support:Beijing Aegean Software Co., Ltd.